Electrical Retrofit & Modernization

Most vessels do not need a new engine room. They need to stop being held up because a 1998 unit is no longer on any shelf in the world.

Our approach to retrofit is deliberately conservative: keep what is sound — cabling, CT/VT, breakers, enclosures — and replace, precisely, what is obsolete or unreliable. Less downtime, less cost, fewer new risks.

Scope of work

  • Technical survey of the existing installation and condition assessment
  • Upgrade proposal that states plainly what stays, what is replaced and what is removed
  • Replacement of obsolete controllers, relays and instruments with current equivalents
  • Modernised generator control and PMS without replacing the switchboard
  • AMS and engine-room screen upgrades
  • Migration from analogue instruments to digital metering and logging
  • Replacement of ageing inverter / VFD drives and starters on cargo pump fans, thrusters and pumps
  • Reconstruction of documentation: single-line, control drawings, I/O lists
  • Phased scheduling so the vessel keeps trading

Typical symptoms & failures

  • Spares that cannot be sourced, or only second-hand
  • Units with no manufacturer support and no documentation
  • Drawings that do not match the installation
  • The same failures recurring in the same places for years
  • No capacity to add a new load or a new machine to the existing system

What you receive

  • Survey report with photographs and equipment condition
  • A phased proposal with estimated downtime per phase
  • Full as-built drawings on completion
  • Commissioning protocol and a recommended spares list

Equipment & protocols

  • Current-generation generator controllers and protection units
  • Digital multi-instruments, transducers and recorders
  • Industrial PLCs and HMIs replacing relay logic
  • Materials and practice to IEC 60092 and class requirements

Frequently asked questions

Does the whole switchboard have to be replaced?

Rarely. In most cases the enclosure, busbars and breakers are sound; what has become obsolete is the control and metering.

Can a retrofit be done without drydocking?

Many control upgrades are done in port stays, in phases. Anything requiring a main-switchboard shutdown is planned around docking.

What if there are no drawings?

We produce them. Surveying the existing wiring is part of the job, and is often the most useful deliverable of the project.

Send us the problem

Describe the system, the vessel and what you are seeing. You get back a concrete intervention plan and a defined scope of work.